Analisis Produktivitas Tukang Batu Bata Pada Proyek Pembangunan Asrama Puteri Mandala Wangi 2 di Kota Kendari

Downloads

Downloads per month over past year

Mustahyun, Al and Sunaryo, Sunaryo and Rahmat, La Ode Musa and Sufrianto, Sufrianto (2021) Analisis Produktivitas Tukang Batu Bata Pada Proyek Pembangunan Asrama Puteri Mandala Wangi 2 di Kota Kendari. Sultra Civil Engineering Journal, 2 (1). pp. 37-45. ISSN 2716-1714

[thumbnail of 166-Article Text-426-1-10-20210928.pdf] Text
166-Article Text-426-1-10-20210928.pdf

Download (846kB)

Abstract

Productivity is one of the fundamental factors that influences the ability of performance in the construction industry. Increased productivity will reduce work time, and will reduce costs, especially labor costs so that the minimum labor cost is obtained (labor costs) to get competitive prices both for auction and implementation. The purpose of this study is to analyze the labor productivity time in completing 1 m2 of masonry bricks and to analyze the productivity value of brick masons in completing work activities in the construction project of the Mandala Wangi 2 female dormitory. The results showed that the time required to complete 1 m2 of brick laying work was 41.13 minutes on average. The productivity of the artisans working on the 1st floor is an average of 1.45 m2/hr. Meanwhile, the productivity of craftsmen working on the 2nd floor is an average of 1.47 m2/hr.

Item Type: Article
Uncontrolled Keywords: Productivity, Bricklayers, Projects
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Prodi Teknik Sipil
Depositing User: sufrianto satam
Date Deposited: 29 Oct 2023 11:01
Last Modified: 29 Oct 2023 11:01
URI: http://eprints-unsultra.ac.id/id/eprint/23

Actions (login required)

View Item
View Item