Ali, Rahmat and Lakawa, Irwan and Hawa, Sitti and Sufrianto, Sufrianto (2022) Faktor-Faktor Yang Mempengaruhi Mutu Pelaksanaan Proyek Peningkatan Jalan Tedubara-Pising Kabupaten Bombana. Sultra Civil Engineering Journal, 3 (1). pp. 32-40. ISSN 2716-1714
![[thumbnail of 7RahmatAli_Irwan_Mar 2022.pdf]](http://eprints-unsultra.ac.id/style/images/fileicons/text.png)
7RahmatAli_Irwan_Mar 2022.pdf
Download (473kB)
Abstract
This study aims to analyze the factors that influence the quality of the implementation of improving the Tedubara-Pising street in Bombana Regency. This study uses quantitative data analysis techniques with a sample size of 30 respondents. The results showed that the factors affecting the quality of the Tedubara Pising road improvement in Bombana Regency were financial indicators (X3) 21.97%, followed by Human Resources indicators (X1) 20.14%, location indicators (X5) 19.68 %, material indicator (X2) 19.22%, and the lowest is equipment indicator (X4) 18.99%. Factors related to the quality of road improvement, namely the human resources variable with a value of 0.855 and material with a value of 0.853. This shows a very strong relationship
Item Type: | Article |
---|---|
Uncontrolled Keywords: | Quality, Project, Road Improvement |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik > Prodi Teknik Sipil |
Depositing User: | Nanang Marianto |
Date Deposited: | 06 Jan 2024 13:48 |
Last Modified: | 07 Jan 2024 02:00 |
URI: | http://eprints-unsultra.ac.id/id/eprint/33 |